Vendor Approval RDSO

Railway fabrication • Quality • Compliance

Vendor Approval RDSO

Bhartia Infra Projects Limited — RDSO-approved fabrication facility for steel girder manufacturing, backed by documented quality systems, testing arrangements, calibrated equipment and major railway bridge fabrication experience.

BIPL Fabrication Unit JL-32, Mouza-Barunda, PO-Bagnan, Howrah, West Bengal – 711303, India
20,000 MTApprox. annual production capacity
25 Jul 2025Last RDSO quality audit
24 Jul 2030Next quality audit due
411Workmen availability in supplied status sheet

Compliance Schedule of Technical Requirements

Schedule of Technical Requirements (STR) for fabrication of steel girders (Part A & B), identified in the supplied draft as BS-S-7.5.3.1-4 Ver. 5.0. The page is structured around the same information-first approach as the reference vendor-approval page, while using BIPL's own documents, plant information and project records.

RDSO Registration

Registration ID 2710, dated 31.08.2020, with subsequent continuation / quality-audit documentation.

Fabrication Scope

Steel through girders, plate girders, composite girders and open web girder fabrication records supplied for the page.

Quality System

ISO 9001:2015 and BIS quality-management certification documentation are included in the supplied records.

Ownership Details

Board information, registered office, regional office and contact details as supplied in the web-page draft.

#Name of DirectorDINDesignation
1Ramawatar Bhartia479193Managing Director
2Pawan Kumar Bhartia479199Whole Time Director
3Avinash Bhartia479197Whole Time Director
4Cherry Jain11019243Director
5Dhiraj Kumar Jain2792485Director

Registered Office

201 Royal Arcade, Dr. B. Baruah Road, Ulubari, Guwahati – 781007.

Regional Office

403/404 MK Point, 27 Bentinck Street, Kolkata – 700001.

Contact

+91-33-29740174 · Fax +91-33-46047477
kolkata@bhartiainfra.com · fabrications@bhartiainfra.com

Plant, Layout & Production Infrastructure

Bhartia Infra Projects Limited, JL-32 Mouza-Barunda, PO-Bagnan, Howrah, West Bengal – 711303, India.

Area / FacilityUseArea
Template layout area15 m × 65 m975 m²
Fabrication shopCutting, drilling, welding, straightening, end milling4,401 m²
Blasting shopSurface preparation / blasting807 m²
Metalizing & painting shopMetalizing and painting383 m²
Assembly areaGirder assembly2,628 m²
Stacking areaFinished / fabricated member stacking2,080 m²
Other facility / area / shopOther supporting facilities5,080 m²
Power infrastructure: the supplied draft records power demand of 300 + 300 = 600 KVA and installed power supply of 630 + 750 = 1,400 KVA.

Plant & Machinery — selected photographs

RDSO & Quality Compliance

RDSO

Registration ID 2710 · 31.08.2020. Last quality audit: 25.07.2025. Next quality audit due: 24.07.2030.

ISO 9001:2015

Certificate AMER17145. Original issue 16.03.2024; recertification date shown as 15.03.2027. Scope: manufacturing of heavy steel structures & bridge girders.

BIS QMS

Supplied BIS certificate shows the current certification cycle from 26.03.2026 to 15.03.2027.

Factory Licence

Reg. No. 0043/HW/X/2019 · Licence No. 021971 · valid through 24.11.2027.

Dates and identifiers above are transcribed from the supplied web-page draft and certificates. Keep the signed PDF copies available as the authoritative records.

Testing & Calibration Facilities

Physical / Chemical / Mechanical + UT / RT

SKB Metallurgical Services LLP, Salkia, Howrah. NABL Certificate No. TC-8027; supplied validity 10.10.2025–09.10.2029.

DPT

In-house facility, as stated in the supplied web-page draft.

PAUT

Sagnik NDE, Adarsha Pally, Birati, near Water Pump, Kolkata – 700051.

Calibration

The supplied 2026–27 calibration index lists 43 instruments / machines with calibration due dates extending into 2027.

Selected Executed Works

Selected records from the supplied five-year project schedule, focusing on girder fabrication, railway bridges, ROBs and metro infrastructure.

17 × 78.8 m Open Web Girder | 25T loading7,565 MT

Bairabi–Sairang Railway Project

Fabrication, assembling and erection of steel through/plate/composite girders for major bridges between Bairabi and Sairang, Mizoram.

ClientN. F. RailwayInspectionRDSO (Lucknow)
1 × 74.0 m non-standard Bow String Truss Girder731.54 MT

Kampur / Digru–Hojai ROB

Fabrication and erection of a non-standard bolted Bow String Truss Steel Girder.

ClientN. F. RailwayInspectionRDSO (Lucknow)
Composite and Open Web Girder spans1,081.53 MT

New Bongaigaon–Agthori Doubling

Fabrication and erection of composite girder and open web girder spans for major bridges.

ClientN. F. RailwayInspectionRDSO (Lucknow)
OWG spans up to 76.2 m3,149.62 MT

Dhansiri–Zubza / Kohima New Line

Open Web Girder fabrication and erection for bridges over River Pagla and the Pherima station viaduct.

ClientN. F. RailwayInspectionRDSO (Lucknow)
Composite plate girders + OWG1,623.95 MT

Dhansiri–Zubza New Line

Fabrication and erection of composite ROB girder spans, composite girder spans and open web girder spans.

ClientN. F. RailwayInspectionRDSO (Lucknow) & Zonal Railway FIU
Metro viaduct works680 MT approx.

Joka–Esplanade Metro Railway Project

Construction of the Metro Railway Viaduct including Mominpur and Majerhat stations and ramp at Joka depot end.

ClientRVNL KolkataInspectionRDSO (Lucknow)

Selected works in hand

ProjectScope / SpanRecorded quantity
Dimapur–Kohima New Line – Viaduct Br. 154A14 × 30.5 m composite girder5,152 MT
Bangaon–Petrapole – Br. 76T3 × 31.926 m effective span RDSO truss girder225 MT approx.
Eastern Railway – Br. 62 DN / 53 DN replacement25-ton loading standard girders267 MT approx.
Bhattanagar–Dankuni / HWH DivisionNon-standard semi-through plate girdersWeight to be confirmed in project record

Fabricated spans & bridge structures

Organization & Technical Personnel

The supplied personnel schedule covers management, plant operations, QA/QC, RDSO inspection, drawing/CNC planning, NDT, stores, materials, painting and maintenance.

#NameDesignationQualificationExperience
1Arun AgarwalCEOMasters in Business Administration32 years – business management
2Malay SahooPlant ManagerB.Tech. Mechanical Engineering; Level II in UT, RT, DPT, MPT18 years – fabrication
3Rahul Kumar SinghQA/QC & RDSO InspectionDiploma in Mechanical Engineering; CWI (WRI-BHEL)19 years – fabrication
4Prassana GhoshDrawing, CNC Operation & Planning EngineerDiploma in Mechanical Engineering8 years – fabrication
5Sabir SwainSr. EngineerB.Tech. Mechanical Engineering8 years – fabrication
6Suman GoshEngineerB.Tech. Mechanical Engineering8 years – fabrication
7Shiv Shankar DeyEngineerDiploma in Mechanical Engineering12 years – fabrication
8Hiralal MaityDrawing EngineerDiploma12 years – drawing
9Sanjay KumarPainting EngineerB.Tech. Mechanical Engineering7 years – fabrication
10Subara BagNDTDiploma in Mechanical Engineering3 years – NDT
11Prasun MannaQC EngineerDiploma in Mechanical Engineering2 years – fabrication
12Rakesh DasEngineer – MaterialDiploma in Mechanical Engineering5 years – fabrication
13Ajoy Shukla BaidyaStore & Material ManagementGraduation20 years – store
14Suvankar MandolStore AssistantGraduation4 years – store
15Shambhu PandaElectricianITI in Electrical10 years – industrial maintenance

Workmen availability

#Category / RankAvailability
1Fabricator8
2Marker12
3Fitter30
4CNC Operator4
5Driller Radial10
6Magnetic Driller30
7SAW Welder24
8GMAW Welder30
9SMAW Welder25
10Gas Cutter40
11Grinder60
12Rigger15
13Helper60
14Blaster8
15Painter15
16Metallizer10
17Painter Helper30
Total411

Tools, Plants & Machinery

The supplied machinery register contains welding, CNC, drilling, lifting, hydraulic, grinding and surface-treatment equipment. The category summary below preserves the quantities stated in the source register.

CategoryQuantityPrincipal makes recorded
Submerged Arc Welding11ESAB / ADOR / DNH / KAIYUAN
MIG Welding20ESAB / PANASONIC / KEMPPI
Arc Welding25PANASONIC / ESAB / KRAFT INDIA
Flux Oven5ESAB
CNC / Beam Processing6ADOR / ZHOUXIANG / Plate Roll
Pug Cutting17ESAB
E.O.T. / Gantry Cranes8Shiva Ferrious / SAFEX / DEMAC
Hydraulic Cranes7ESCORTS
Radial Drill Machines7BATLIBOY / HMT / BHAVYA / PATHAK
Core Drill Machines11EBENSTOCK
Hydraulic Jacks / Pumps / Power Packs40VENKOS / HI-TECH
Grinding Machines58DEWALT

Certificates, Approvals & Layout Drawings

Open the supplied source documents directly. For the final WordPress page, upload these PDFs to the Media Library and replace the relative links with their WordPress media URLs.

Pending source uploads: the supplied draft also lists Company Registration, Memorandum & Articles of Association and UDYAM Registration. Those source files were not among the uploaded documents available for this build, so they have intentionally not been fabricated or linked.