Vendor Approval RDSO

<center>RDSO Approved Vendor Details — Bhartia Infra Projects Limited</center>

RDSO Approved Vendor Details

BHARTIA INFRA PROJECTS LIMITED is an approved vendor/fabrication facility for steel girder fabrication. Schedule of Technical Requirements (STR) for fabrication of Steel Girders (Part A & B), document reference BS-S-7.5.3.1-4, Version 5.0.,dated effective-15.08.2026.

RDSO Registration ID: 1050455Annual Capacity: 10,000 MT approx.Howrah Fabrication UnitSTR: BS-S-7.5.3.1-4 / Version 5.0

Company Registration

Legal NameBhartia Infra Projects Limited

CINU45203AS1999PLC0005740

Constitution / IncorporationPublic Limited Company

Share Capital stated in MOA₹4,00,00,000 divided into 40,00,000 equity shares of ₹10 each.

Registered & Regional Offices

Registered Office201 Royal Arcade, Dr. B. Baruah Road, Ulubari, Guwahati – 781007, Assam, India.

Regional / Administrative Office403/404 M.K. Point, 27 Bentinck Street, Kolkata – 700001.

Websitebhartiainfra.com

Emailkolkata@bhartiainfra.com · fabrications@bhartiainfra.com

#DirectorDINDesignation
1Ramawatar Bhartia479193Managing Director
2Pawan Kumar Bhartia479199Whole Time Director
3Avinash Bhartia479197Whole Time Director
4Cherry Jain11019243Director
5Dhiraj Kumar Jain2792485Director

Fabrication Unit Address: JL-32, Mouza-Barunda, PO-Bagnan, Howrah, West Bengal – 711303, India.

975 m²

Template Layout

15 m × 65 m.

4,401 m²

Fabrication Shop

Cutting, drilling, welding, straightening and end milling.

807 m²

Blasting Shop

Surface preparation / blasting.

383 m²

Metalizing & Painting

Metalizing and painting shop.

2,628 m²

Assembly Area

Girder assembly / trial assembly.

2,080 m²

Stacking Area

Finished / fabricated member stacking.

Plant & Machinery Coverage

SAW welding, MIG/GMAW, arc welding, CNC cutting/drilling, beam welding, end milling, straightening, pug cutting, cranes, drilling, hydraulic jacks/power packs and grinding equipment are covered in the detailed machinery schedule.

⚙

Plant & Machinery Tools

Plant, machinery and fabrication-facility photographs reproduced from the supplied BIPL fabrication-unit document, with the descriptions shown in the PDF.

PHOTO 01
Template Layout Area

Template Layout Area

1. Template layout area – (15m x 65m) = 975 m².

PHOTO 02
Template Layout Area

Template Layout Area

Template layout area – additional photograph of the 975 m² template layout area.

PHOTO 03
Fabrication Workshop

Fabrication Workshop

2. Fabrication work-shop – 4401 m².

PHOTO 04
CNC Cutting Machine

CNC Cutting Machine

CNC Cutting Machine.

PHOTO 05
CNC Cutting Machine

CNC Cutting Machine

CNC Cutting Machine – additional photograph of the cutting equipment.

PHOTO 06
CNC Drilling Machine

CNC Drilling Machine

CNC Drilling Machine.

PHOTO 07
CNC Drilling Machine

CNC Drilling Machine

CNC Drilling Machine – additional photograph of the drilling equipment.

PHOTO 08
CNC Welding Machine Area

CNC Welding Machine Area

CNC Welding Machine Area.

PHOTO 09
CNC Welding Machine Area

CNC Welding Machine Area

CNC Welding Machine Area – additional photograph.

PHOTO 10
Straightening Machine Area

Straightening Machine Area

Straightening Machine Area.

PHOTO 11
End Milling Machine

End Milling Machine

End Milling Machine.

PHOTO 12
Blasting Shop

Blasting Shop

Blasting Shop – 807 m².

PHOTO 13
Metalizing & Painting Shop

Metalizing & Painting Shop

Metalizing & Painting Shop – 383 m².

PHOTO 14
Metalizing & Painting Shop

Metalizing & Painting Shop

Metalizing & Painting Shop – additional photograph.

PHOTO 15
Assembly Area

Assembly Area

Assembly Area – 2628 m².

PHOTO 16
Assembly Area

Assembly Area

Assembly Area – additional photograph.

PHOTO 17
Assembly Area

Assembly Area

Assembly Area – additional photograph.

PHOTO 18
Assembly Area

Assembly Area

Assembly Area – additional photograph.

PHOTO 19
Stacking Area

Stacking Area

Stacking Area – 2080 m².

PHOTO 20
Stacking Area

Stacking Area

Stacking Area – additional photograph.

1050455

Registration ID

Registration date: 31.08.2020.

10,000 MT

Annual Production Capacity

Approximate capacity recorded in the supplied schedule.

25.07.2025

Last Quality Audit

Last quality audit recorded.

24.07.2030

Next Quality Audit Due

Next audit date recorded.

Document status: No MSME/Udyam registration number or certificate is present in the supplied source records. Therefore, no number has been invented on this webpage.

If Bhartia Infra Projects Limited has an applicable MSME/Udyam certificate, add the certificate PDF to the WordPress Media Library and replace the placeholder below with its URL.

Factory Registration

Registration No.0043/HW/X/2019

Licence No.021971

Validity24.11.2027

SUPPORTING RECORD AVAILABLE

Factory licence document is linked directly from this STR tab.

BIS CERTIFICATION

Certifying BodyBUREAU OF INDIAN STANDARDS

CertificateQMS/ERO/L-2026029657

Original Issue26/03/2026

Recertification15/03/2027

ISO 9001:2015

Certifying BodyAMERICO Quality Standards Registech Pvt. Ltd.

CertificateAMER17145

Original Issue16/03/2024

Recertification15/03/2027

Scope

Manufacturing of heavy steel structures & bridge girders.

Physical / Chemical / Mechanical + UT / RT
(Out source)

SKB Metallurgical Services LLP, 144/6 Dharmatala Road, Salkia, Howrah – 711106. NABL Certificate No. TC-8027.

DPT

In-house DPT testing facility recorded in the supplied web-page draft.

PAUT
(Out source)

Sagnik NDE, Adarsha Pally, Birati, near Water Pump, Kolkata – 700051.

NABL

SKB Metallurgical Services LLP — TC-8027, recorded valid 10.10.2025–09.10.2029.

AERB / ASNT

Records are identified in the supplied compliance schedule; evidence should be linked where available.

Total workmen: 411 across fabrication, welding, cutting, grinding, rigging, blasting, painting and metalizing functions.

CategoryAvailabilityCategoryAvailability
Fabricator20Fitter30
CNC Operator4Radial Driller10
Magnetic Driller30SAW Welder24
GMAW Welder30SMAW Welder25
Gas Cutter40Grinder60
Rigger15Helper60
Blaster8Painter15
Metallizer10Painter Helper30
Total workmen411
600 KVA

Power Demand

300 + 300 = 600 KVA.

1,400 KVA

Installed Power Supply

630 + 750 = 1,400 KVA.

Fabrication Process

Template layout → cutting → drilling → welding → straightening → end milling → blasting → metalizing & painting → assembly → stacking.

#Project / WorkSteel Girder Scope / SpanFabrication WeightClient / Inspection
1Bairabi–Sairang, Mizoram17 × 78.8 m OWG7,565 MTN.F. Railway / RDSO Lucknow
2Kampur / Digru–Hojai1 × 74.0 m non-standard Bow String Truss731.54 MTN.F. Railway / RDSO Lucknow
3New Bongaigaon–Agthori2 × 45.7 m OWG + 3 × 61.0 m OWG + composite girders1,081.53 MTN.F. Railway / RDSO Lucknow
4Dhansiri–Zubza New LineComposite girders + OWG spans1,623.95 MTN.F. Railway / RDSO Lucknow & FIU
5Dhansiri–Kohima New Line3 × 61.0 m OWG + 7 × 76.2 m OWG3,149.62 MTN.F. Railway / RDSO Lucknow
6Digru–Hojai ROB1 × 42.0 m Bow String welded ROB girder248.21 MTN.F. Railway / RDSO Lucknow
7Joka–Esplanade MetroMetro Railway viaduct / station-related steel work680 MT approx.Metro project record
8NH-60 ROB, West Bengal1 × 60 m welded Bow String Girder1,426 MT approx.RDSO Lucknow
9NH-327E ROB, Bihar60 m Bow String Girder447 MT approx.RDSO Lucknow
10Jorhat Town ROB, AssamThree-lane ROB steelwork528 MT approx.N.F. Railway project record
11Sripuria, Tinsukia ROB1 × 60.0 m Bow String Girder497 MT approx.RDSO Lucknow
12Allahabad–Bamhrauli RFO20 × 30.5 m composite welded girders1,620 MT approx.RDSO Lucknow
13Jalangi Bridge, Eastern Railway18.3 m + 30.5 m + 45.7 m + 2 × 76.2 m OWG944 MT approx.RDSO Lucknow
14Suri ROB, NH-602 × 48.0 m Bow String Girder944 MT approx.RDSO Lucknow
15NH-19 Palsit–Dankuni2 × 54.0 m welded Bow String Girder919 MT approx.RDSO Lucknow
16Bridge 146B, Lumding Division1 × 45.7 m OWG141 MT approx.RDSO Lucknow
17JSL Jajpur, Odisha8 × 30.5 m structural ROR636 MT approx.East Coast Railway record
18Kumarghat–Agartala11 × 24.0 m composite girder spans687 MT approx.N.F. Railway / RDSO Lucknow
19Murkongselek–Pasighat9 × 45.7 m OWG1,276 MT approx.Railway project record
20HWH Division Bridge Replacements27 × 18.3 m plate girder spans636 MT approx.Eastern Railway / RDSO Lucknow
21Belghoria ROB1 × 13.5 m + 1 × 27.8 m effective spans127 MT approx.Eastern Railway / RDSO Lucknow
22Bridge 125, Sainthia–GadadharpurReplacement of existing spans with new welded girders84 MT approx.Eastern Railway / RDSO Lucknow
23Guwahati Flyover53 × 40.0 m span flyover steelwork4,571 MTPWD Assam
24Guwahati–North Guwahati ROB2 × 62.0 m non-standard Bow String Girder1,428 MTRDSO Lucknow
25Sitarampur Bypass Line1 × 45.7 m OWG + 165 × 18.3 m composite welded girders1,486 MTAsansol Division / RDSO Lucknow
26Bridge 520/B, KAN–ASN1 × 45.7 m OWG141 MT approx.Asansol Division / RDSO Lucknow
27Br. 236 & 264, HWH Division6 × 18.3 m welded plate girders168 MT approx.Howrah Division / RDSO Lucknow
28Illoo–Silli Bypass Line7 × 24.4 m welded composite steel girders396 MT approx.South Eastern Railway / SER-FIU
29Bhagalpur ROB4 × 24.0 m welded steel composite girder388 MT approx.BRPNNL / RDSO Lucknow
30Katihar–Kumedpur Doubling1 × 30.5 m OWG with related railway works75 MT approx.N.F. Railway Construction / RDSO Lucknow
ProjectScopeRecorded Fabrication Quantity
Dimapur (Dhansiri) – Kohima (Zubza) New LineViaduct Br. 154A at Pherima yard14 × 30.5 m · 5,152 MT
Bangaon – Petrapole, Br. 76TRDSO truss girder replacement / fabricationApprox. 225 MT
HWH Division – Br. 62 DN / 53 DNReplacement of RBG standard girders with 25-ton loading standard girdersApprox. 267 MT
Bhattanagar – Dankuni / HWH DivisionNon-standard semi-through plate girder regirdering and RUB worksProject record supplied